Tower crane over a concrete frame under construction
Harbour Point · Rotterdam 23 sites active today

Est. 1987 · Rotterdam · Hamburg · Warsaw

General contracting, design & build and civil works for owners who can’t afford surprises — delivered on programme, on budget, and home safe every night.

Projects delivered
Active sites today
Handed over on time
%
Million m² built

01 What we build

Five trades.One contract.

  1. Single point of responsibility from mobilisation to handover. Our own site teams, our own safety system, and a programme we publish weekly.

    • Commercial & mixed-use
    • Healthcare & education
    • Fixed-price or cost-plus
    • BIM coordination (LOD 400)
  2. One contract, one team. We bring architects and engineers in-house early so cost, carbon and buildability are designed in — not value-engineered out.

    • Early contractor involvement
    • Target-cost contracts
    • Whole-life carbon modelling
    • Planning & permits
  3. Bridges, quays, roads and utilities for municipalities and ports — built around live traffic, tides and neighbours.

    • Earthworks & foundations
    • Bridges & quay walls
    • Utilities & drainage
    • Traffic management
  4. In-house steel fabrication and erection. Faster frames, fewer interfaces, and welds we sign our name to.

    • Fabrication yard, 8,000 t / year
    • Composite & hybrid frames
    • Certified welding (EN 1090 EXC3)
    • Crane planning
  5. Deep retrofits of occupied buildings: new façades, new services and lower energy bills — while the lights stay on.

    • Façade replacement
    • Energy retrofits
    • Occupied-building phasing
    • Heritage works

02 From drawing to delivery

Every line becomes load-bearing.

Drag across Harbour Point: the tender drawing on the left, the finished building on the right — 58 weeks apart, 2% under budget.

Harbour Point Offices, as builtAs built · Week 58
Project
Harbour Point Offices
GFA
24,600 m²
Floors
9 + basement
Programme
58 weeks
Rating
BREEAM Excellent

03 Selected projects

Built, handed over, still standing.

04 Process

A programme you can read.

Week64/ 64

100% complete

Handed over

Pre-constructionSurveys, cost plan, logistics
w0–8
Permits & procurementLong-lead items ordered
w4–14
GroundworksPiling, basement, drainage
w10–20
StructureConcrete core, steel frame
w18–38
EnvelopeFaçade, roof, weather-tight
w32–46
MEP & fit-outServices, finishes, lifts
w40–58
CommissioningTesting, snagging, training
w55–62
HandoverKeys, manuals, aftercare
w62–64

We publish the programme every Monday. This is what a typical 64-week office build looks like — scroll to move the “today” line.

05 Safety & sustainability

Home safe every night.

Every worker on every Brace site goes home the way they came in. We count the days — publicly — and so does everyone who works for us.

Days without a lost-time incident

Across all 23 active sites · updated live

  • ISO 45001Occupational health & safety
  • ISO 9001Quality management
  • ISO 14001Environmental management
  • EN 1090Steel execution class EXC3
38%
Less embodied carbon vs. 2019 baseline
92%
Site waste diverted from landfill
100%
Renewable power on active sites
“Brace told us the bad news early, fixed it without drama, and handed over two weeks ahead of programme. We’ve awarded them the next three phases.”
Maarten de Wit — Development Director, Kadeport Real Estate (fictional)
KadeportNORTHWINDLinden & Co.HavenstadVOLTA ENERGYMeridian HealthOstrava RailCityWorks

06 Get an estimate

Ballpark in sixty seconds.

What are you building?